Manufacturing

Get plant maintenance off the spreadsheet and the whiteboard

For plants with a handful of technicians and a maintenance history that lives in someone's head. Powoflow does the job of a CMMS: machine records, work orders, preventive maintenance and checklists. Free for one site and three users.

Work Orders

DashboardWork OrdersRequestsPM SchedulesTemplates

Swipe sideways for more columns

WO #TitleAssetTypePriorityAssigneeDueStatus
WO-2026-0142Replace inlet filterBooster Pump P-3PreventiveMediumA. Berg2026-11-14Open
WO-2026-0141Quarterly vibration checkCompressor C-201InspectionLowM. Ortiz2026-11-12In Progress
WO-2026-0140Door seal leakingCold Room 2CorrectiveHighJ. Lund2026-11-11Open
WO-2026-0139Clean solar arraySolar Array NorthPreventiveNoneK. Patel2026-11-18Open
WO-2026-0138Generator load testGenerator G1InspectionMediumA. Berg2026-11-08Complete
WO-2026-0137Replace drive beltConveyor Line 2CorrectiveHighS. Nakamura2026-11-07Complete
WO-2026-0136Inspect anchor boltsWeather Mast WM-1InspectionLowM. Ortiz2026-11-06Complete
WO-2026-0135Recalibrate dosing pumpDosing Pump DP-4PreventiveMediumJ. Lund2026-11-05On Hold
WO-2026-0134Service and tyre checkUtility Truck T-07PreventiveNoneK. Patel2026-11-04Complete
WO-2026-0133Rooftop unit filter changeHVAC RTU-4PreventiveLowS. Nakamura2026-11-03Complete
The work-order list, shown with made-up work orders, assets and people.

The problem

The plant runs on what a few people remember.

01

The history leaves with the person

One technician knows which gearbox was rebuilt and when. When they are off shift or move on, so is that knowledge.

02

The service that was due last month

Lubrication rounds and filter changes sit on a calendar nobody owns, so they get done after the breakdown.

03

Jobs handed over in the corridor

A fault is mentioned at shift change, written on a whiteboard and wiped. Nobody can say whether it was fixed.

04

Software priced per head

When a tool charges for each user, a small team ends up sharing one login, and the record no longer shows who did the work.

Where to start

No hardware needed. The first 30 days run at Professional limits.

02

Send us your machine list

A spreadsheet is enough. We bring it in with you, so you begin with your own machines. Starter and Professional can begin from the manufacturing starter template.

03

Enter the jobs you already know about

Take the open faults off the whiteboard, raise each as a work order and assign it.

04

Add one maintenance plan

Pick the service that is most often late, set its interval, and let the plan raise the next job.

What it does not do yet

  • Plans are driven by the calendar. Running hours and cycle counts cannot trigger a job yet.
  • Every machine has a QR code, but you cannot print labels from the browser yet.
  • You can export work orders as a spreadsheet yourself. For your machine records, ask and we export them for you.
  • Temperature and humidity sensors for cold rooms and stores are still being validated on our own system, and are available on request.

Start with the machine that breaks most

Free for one site and three users, and priced per account when you grow.